Stoneham Building Committee Advances Discus Net Fix, Tables Bollard and Dugout Decisions

STONEHAM — May 6, 2026 — Stoneham's School Building Committee advanced a $21,000 discus netting fix and shelved pricier stadium upgrades at its May 6 meeting. The committee voted unanimously to finalize pricing for a 40-foot extension of the existing discus cage netting after athletic staff reported two errant throws landed on an active track during a spring meet with more than 500 athletes on campus; rough estimates from subcontractor Emmanuel place the job between $18,000 and $22,000. The panel also approved Change Order 56 for $29,815.20, covering temporary lighting, stadium locker-room ceiling paint, and a band room door lock. Members rejected spending roughly $28,000 to replace exterior dimensional lettering after a school-side representative said "I just don't think it's bothering folks all that much." A proposed bollard-and-gate overhaul at the stadium entrance — sparked by a report that five-foot-deep bollards required multiple people to remove during a fire department emergency call — was sent back to staff with direction to consult the fire chief, with the committee eyeing a resolution before football season.

Keep reading with a 14-day free trial

Subscribe to The Stoneham MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Stoneham MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Stow Post · The Sudbury Post · The Tewksbury Post · The Townsend Post · The Tyngsborough Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.