Stoneham Building Committee Advances Discus Net Fix, Tables Bollard and Dugout Decisions
STONEHAM -- May 6, 2026, Stoneham's School Building Committee advanced a $21,000 discus netting fix and shelved pricier stadium upgrades at its May 6 meeting. The committee voted unanimously to finalize pricing for a 40-foot extension of the existing discus cage netting after athletic staff reported two errant throws landed on an active track during a spring meet with more than 500 athletes on campus; rough estimates from subcontractor Emmanuel place the job between $18,000 and $22,000. The panel also approved Change Order 56 for $29,815.20, covering temporary lighting, stadium locker-room ceiling paint, and a band room door lock. Members rejected spending roughly $28,000 to replace exterior dimensional lettering after a school-side representative said "I just don't think it's bothering folks all that much." A proposed bollard-and-gate overhaul at the stadium entrance, sparked by a report that five-foot-deep bollards required multiple people to remove during a fire department emergency call, was sent back to staff with direction to consult the fire chief, with the committee eyeing a resolution before football season.
Members read the rest of this story and every Stoneham meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Stoneham who follows town government? Share Townbrief Stoneham: they can sign up free.